 | | | Replacing of a mast in an existing membrane structure without dismanteling or disturbing the usage area. |
|
|
 | | | Fine adjustment of poles, mast, membrane and tie downs. Covering the tie downs with material to prevent casualties among the visitors. |
|
|
 | | | Lifting a pre-assembeled mast into a special tubelar foundation unit. By filling sand into the foundation the mast will rise and tension the membrane. |
|
|
 | | | Investigating and documentation of an old membrane structure. the membrane has belt edges. |
|
|
 | | | Big lift of a cone structure. |
|
|
 | | | Installation of the second layer membrane to a frame structure. The membrane structure is like a cushion and has on top as on the bottom a double curvature. |
|
|
 | | | Mounting of a high-point with rope and lever-technology |
|
|
 | | | Montages of a high-point with qualified height-workers |
|
|
|